ADU Rules in Campbell, CA

ADU Rules in Campbell, CA (2026 Guide)

Planning an ADU, garage conversion or JADU in Campbell? Here is what Campbell allows: size limits, height, setbacks, parking, owner occupancy, fees and the permit process, compiled from the official city ADU page and municipal code.

Santa Clara County · Last reviewed: November 2026 (City ADU Bulletin, Mar. 5, 2025; Ordinance No. 2322)

Building in Campbell? iBuilders Design and Build designs, permits and builds detached ADUs, attached ADUs, garage conversions and JADUs in Campbell and across the Bay Area. Our in-house architects and engineers prepare the plans, we handle the city permit, and one project manager runs your build.

Book a free consultation · (650) 770-3586

Permit Process in Campbell

  • Streamlined process for detached ADUs on all eligible parcels and attached ADUs that do not fall under the following categories:
  • Site and Architectural Review
  • Attached ADUs in San Tomas Area Neighborhood Plan
  • Attached ADUs created by adding 750 sq ft or greater in gross floor area or 350 sq ft or greater in gross floor area on a second-story, on a property located in the R-1-8 zoning district that are not subject to the San Tomas area neighborhood plan.

Where ADUs Are Allowed in Campbell

All residential zoning districts

P-D (Planned Development) Zoning District on a parcel with a General Plan land use designation that directly corresponds to a residential zoning or mixed-use district (as specified by Section 21.04.020).

How Many Units in Campbell

  • Single-Family Properties:
  • One ADU and one JADU may be built, as long as the property satisfies the minimum standards outlined in Section 21.23.020 of the Campbell Municipal Code
  • Multi-Family Properties:
  • Up to one ADU for every four non-ADU units within the dwelling structure can be created from existing, non-livable space
  • Up to two detached ADUs may be built in addition
  • An ADU can contain only one kitchen and one living room (defined as a habitable room with an area not less than one hundred twenty square feet).

Minimum Size in Campbell

150 square feet

Size Limits in Campbell

  • 500 square feet for JADUs
  • 1,200 square feet for ADUs
  • Attached or interior ADUs (and JADUs) shall not exceed 50% of the living area of the primary dwelling unit

Height in Campbell

  • Detached ADUs:
  • ADUs may be up to 2 stories if the (existing or proposed) primary dwelling unit is also 2 stories
  • ADUs may be up to 18’, with an additional 2′ height permitted if necessary to align the roof pitch with the roof pitch of the (existing or proposed) primary dwelling unit
  • After 18’, the height of a detached ADU may not exceed the height of the primary dwelling unit
  • Attached ADUs:
  • ADUs may not exceed the height specified by the applicable zoning district and/or neighborhood Plan

Setbacks in Campbell

Setback requirements are determined by the zoning

Statewide exemption accessory dwelling units are exempt from the otherwise required (1) front setback, (2) building separation, (2) floor area ratio, (3) lot coverage, (4) open space, and (5) design requirements specified by Section 21.23.030 (Accessory dwelling unit development standards) and the design and placement requirements specified by Section 21.23.060 (Special provisions for historic properties), except that the exemption to the front setback for an attached accessory dwelling unit shall only apply to that portion of the primary dwelling unit occupied by the accessory dwelling unit. All other standards, requirements, and restrictions of this Chapter shall continue to apply.

Lot & Location Rules in Campbell

  • An ADU may be located in front of, to the side of, or behind the primary dwelling unit
  • Lot coverage and floor area ratio (FAR) must comply with zoning district
  • Open Space Requirements – Creation of an ADU can not reduce the required open space to less than what is specified by zoning
  • Check with staff for possible exemptions

Parking in Campbell

No parking spaces are required for new ADUs or JADUs

Parking spaces that are removed to allow for an ADU or JADU do not have to be replaced (e.g., by demolition or conversion of a garage)

Owner Occupancy in Campbell

On a property with a Junior ADU, the property owner must live in either the Junior ADU or the primary dwelling unit

The community development director may require a deed restriction documenting this owner-occupancy rule before issuing a building permit

Deed Restrictions in Campbell

Recording of deed restriction is required before a building permit can be issued

Individual HOA requirements as applicable

Renting Rules in Campbell

Generally, ADUs and JADUs cannot be rented for fewer than 30 days at a time

Fees in Campbell

  • Fees vary depending on the size of the ADU, and typically range from $2,500 for a simple garage conversion to $14,000 for construction of a 1,200 detached ADU
  • ADUs less than 750 square feet are not required to pay the the following fees:
  • Campbell Union School District fee
  • Park fee

Real Permit Fee Examples in Campbell

  • 1159 square foot, detached ADU, built in 2022
  • Post Entitlement Plan Check – Ministerial Projects = $79.00
  • Fire Plan Check = $168.00
  • Fee at Plan Check In-House = $1,820.00
  • Title 24 Energy Plan Check Fee = $183.00
  • Deed Restriction = $207.00
  • Waste Management Compliance Fee = $35.00
  • Address Change or Addition = $183.00
  • Residential Building Permit Group
  • Technology Enhancement Fee = $104.00
  • State Seismic Fee = $33.30
  • Roadway Maintenance Fee = $832.00
  • Plumbing Sub Trade Permit = $155.00
  • Ministerial Projects Review = $79.00
  • Mechanical Sub Trade Permit = $155.00
  • General Plan Maintenance Fee = $416.00
  • Electrical Sub Trade Permit = $155.00
  • CA Building Standards Commission = $11.40
  • Construction License Tax = $579.50
  • Building Permit Fee = $5,200.00
  • Park Fees = $7,905.00
  • Credit Card Processing Fee = $3125.81 (4.00%)
  • TOTAL = $18,626.01

Departments & Agencies Involved in Campbell

  • Campbell Community Development Department- Planning, Building, Public Works
  • Santa Clara County Fire District
  • West Valley Sanitation District
  • Santa Clara County Recorder’s Office
  • Campbell Union School District (if ADU is above 750 square feet)

Resources, Utilities & Documents in Campbell

Let's plan your Campbell ADU

Tell us about your lot and goals. We will show you what you can build in Campbell, what it costs and how long it takes.

Book a free consultationCall (650) 770-3586

More from iBuilders

Everything ADU, the complete Bay Area ADU guide · Garage to ADU conversions · Room additions · Full house remodeling

ADU Rules in Other Bay Area Cities

Rules, fees and processes change. This page summarizes Campbell's published ADU rules for planning purposes; confirm details with the city before you build. Not legal advice. iBuilders Design and Build · CSLB #1077269 · 710 Lakeway Dr, Suite 200, Sunnyvale, CA 94085.