ADU Rules in Half Moon Bay, CA

ADU Rules in Half Moon Bay, CA (2026 Guide)

Planning an ADU, garage conversion or JADU in Half Moon Bay? Here is what Half Moon Bay allows: size limits, height, setbacks, parking, owner occupancy, fees and the permit process, compiled from the official city ADU page and municipal code.

San Mateo County · Last reviewed: November 2026 (Ch. 18.33, Ord. C-2022-04)

Building in Half Moon Bay? iBuilders Design and Build designs, permits and builds detached ADUs, attached ADUs, garage conversions and JADUs in Half Moon Bay and across the Bay Area. Our in-house architects and engineers prepare the plans, we handle the city permit, and one project manager runs your build.

Book a free consultation · (650) 770-3586

Permit Process in Half Moon Bay

If the ADU conforms to the zoning code (setbacks, height, etc.), the approval letter is drafted, notice is provided, and the ADU is approved. If requiring a variance, ADU might be processed through the planning commission. Making an appointment to meet with a planner in the initial stages of the project can help avoid challenges and is highly recommended.

Where ADUs Are Allowed in Half Moon Bay

R-1, R-2, R-3, C-D, C-R, C-VS, C-G, PUD, and all mixed-use districts

How Many Units & Lot Rules in Half Moon Bay

Lot coverage, floor area ratio, open space apply unless reducing the floor area of the ADU below 850 square feet, or the height below sixteen feet.

Size Limits in Half Moon Bay

  • Min: 150 sf,
  • Max one bedroom or less: 850 square feet,
  • Max two or more bedrooms: 1200 square feet

Height in Half Moon Bay

  • Attached two story: 28 feet
  • Attached one story: 20 feet
  • Detached: 16 feet if within rear yard setback; otherwise 20 feet.

Setbacks in Half Moon Bay

Side and rear: 4 feet, Front: same as primary dwelling

Parking in Half Moon Bay

  • JADUs: No parking required
  • ADUs: One spot may be required (tandem allowed). No parking required if:
  • ½ mile walking distance from public transit, in a historic district, or one block from a car-share vehicle
  • on-street parking permits are required but not offered to ADU occupant
  • *Unless within parking area designated for coastal access

Owner Occupancy in Half Moon Bay

Owner must live in the main dwelling or the ADU

Other Requirements, Design & Rentals in Half Moon Bay

  • One ADU or one JADU allowed per property. One JADU may be allowed with one ADU if the ADU does not exceed 850 square feet
  • Short-term rentals are not allowed.
  • New detached ADUs or additions require a Coastal Development Permit.
  • ADUs must comply with all requirements of the underlying zoning district.
  • If the existing single-family dwelling has fire sprinklers, sprinklers required
  • Generally siding, trim, roofing shall match those of the single-family dwelling in terms of color, material, roof pitch, etc.
  • No separate sewer or water connections required, although a separate water meter is required by the water district.
  • Proposals for tree removals must be approved through the City’s tree protection ordinance.

Fees & Real Permit Examples in Half Moon Bay

  • ADU 1 (2017, 609 sf, attached): $4,612 (does not include water fee)
  • ADU 2 (2017, 682 sf, detached): $4,512 (does not include water fee)
  • Charging impacts for ADUs 750 SF or greater per State law allowances.

Official Half Moon Bay ADU Resources

Let's plan your Half Moon Bay ADU

Tell us about your lot and goals. We will show you what you can build in Half Moon Bay, what it costs and how long it takes.

Book a free consultationCall (650) 770-3586

More from iBuilders

Everything ADU, the complete Bay Area ADU guide · Garage to ADU conversions · Room additions · Full house remodeling

ADU Rules in Other Bay Area Cities

Rules, fees and processes change. This page summarizes Half Moon Bay's published ADU rules for planning purposes; confirm details with the city before you build. Not legal advice. iBuilders Design and Build · CSLB #1077269 · 710 Lakeway Dr, Suite 200, Sunnyvale, CA 94085.