ADU Rules in Millbrae, CA (2026 Guide)
Planning an ADU, garage conversion or JADU in Millbrae? Here is what Millbrae allows: size limits, height, setbacks, parking, owner occupancy, fees and the permit process, compiled from the official city ADU page and municipal code.
Building in Millbrae? iBuilders Design and Build designs, permits and builds detached ADUs, attached ADUs, garage conversions and JADUs in Millbrae and across the Bay Area. Our in-house architects and engineers prepare the plans, we handle the city permit, and one project manager runs your build.
Permit Process in Millbrae
- Review: Ministerial, with no discretionary review or hearing; decision within 60 days of a complete application. Under state law, the City must determine completeness in writing within 15 business days; if incomplete, it lists what is missing and how to fix it.
- With a new single-family home: The ADU or JADU is acted on after the home is approved and cannot be occupied before it.
- Fees: Application fee plus building permit and inspection fees.
- Making an appointment to meet with a planner in the initial stages of the project is highly recommended.
Where ADUs Are Allowed in Millbrae
ADUs: All areas zoned to allow single-family or multifamily residential use, including R-1, R-1LL, R-2, and R-3. Also an accessory use in the C district and the Downtown Improvement Area.
JADUs: Lots zoned for single-family use.
How Many Units & Lot Rules in Millbrae
- Single-family lots: Under state law, up to three units: one converted ADU within the existing or proposed home or an existing accessory structure (expansion of up to 150 sf allowed for ingress and egress), one new detached ADU of up to 800 sf with 4 ft side and rear setbacks, and one JADU.
- Multifamily lots (existing): Conversion ADUs in non-livable space such as storage rooms, attics, basements, or garages, at least one and up to 25% of existing units; plus under state law up to eight detached ADUs, but not more than the number of existing units. Detached ADUs need 4 ft side and rear setbacks; height is 16 ft, or 18 ft with a multistory multifamily dwelling (see Height).
- Multifamily lots (proposed), state law: Up to two detached ADUs.
- Location: Detached ADUs are permitted in the rear half of the lot unless that would preclude an 800 sf, 16 ft ADU with 4 ft side and rear setbacks. ADUs and JADUs may not be built on easements.
Size Limits in Millbrae
- Min: 150 sf.
- Max: 850 sf for a studio or one bedroom; 1,000 sf for more than one bedroom.
- Attached to an existing primary dwelling: Also no more than 50% of the primary dwelling’s floor area, excluding garage and shed areas.
- Max JADU: 500 sf.
Height in Millbrae
- Attached: 25 ft, no more than two stories. On a two-story home, plate height may not exceed the primary dwelling’s.
- Detached: 16 ft, one story, with a 9 ft maximum plate height (plus up to 36 inches for a crawlspace).
- Detached near transit or with multifamily: 18 ft within ½ mile walking distance of a major transit stop or high-quality transit corridor, or on a lot with a multistory multifamily dwelling; plus up to 2 ft to match the primary dwelling’s roof pitch.
- JADU: Height limit for a single-family structure.
Setbacks in Millbrae
- New attached and detached ADUs: 4 ft side and rear; front per base zoning district.
- Separation: At least 5 ft from any single-family, duplex, triplex, or multifamily building, or other accessory structure.
- Conversions: No setback for existing legal living area or an accessory structure converted to an ADU, or a new ADU built in the same location and dimensions as an existing legal structure.
Parking in Millbrae
- JADUs: No parking required, including replacement of displaced parking.
- ADUs: One space per ADU, in addition to the primary dwelling’s parking. Tandem parking and parking in setbacks allowed unless the Director finds them infeasible. No ADU parking required if: Within the proposed or existing primary dwelling or an accessory structure; within ½ mile walking distance of public transit; in an architecturally and historically significant district; on-street parking permits are required but not offered to the occupant; or within one block of a car share vehicle.
- Replacement parking: Not required when a garage, carport, or covered parking structure is demolished or converted for an ADU.
Owner Occupancy in Millbrae
JADU: Under state law, required only if the JADU shares sanitation with the primary dwelling; the owner may live in the main home or the JADU. Not required with separate sanitation, or if the owner is a governmental agency, land trust, or housing organization. Deed restricted.
ADU: Not required
Other Requirements, Design & Rentals in Millbrae
- Entrance: ADUs and JADUs must have a separate entrance from the primary dwelling.
- Zoning: Underlying district standards apply unless inconsistent with the ADU article.
- Design: ADUs and JADUs must match the primary dwelling’s roof, exterior, and window materials, colors, and design, follow residential design standards, and keep the home’s single-family appearance.
- Balconies and decks: None facing the nearest side or rear property line, except for ingress and egress.
- Sale and rental: No separate sale, except as allowed by state law; no short-term rentals or rentals under 30 consecutive days.
- JADUs: Within the walls of the home or a legal garage, with an efficiency kitchen and shared or separate sanitation.
- Fire sprinklers: Not required unless required for the primary dwelling.
- Utilities: Must be underground; no ADU if water or sewer service is inadequate.
Fees & Real Permit Examples in Millbrae
The exact amount of fees vary depending on the specifics of the proposal. No impact fees for projects less than 750 square feet. In addition, other districts provide various services, such as fire, sanitary, water, and schools that may assess a fee.
State-Law Protections & Exceptions in Millbrae
- Ministerial waiver: Development standards are waived to the extent necessary to approve ADUs and JADUs ministerially under state law.
- Rear-half rule: Does not apply if it would preclude an 800 sf, 16 ft ADU with 4 ft side and rear setbacks.
- Balconies and decks: The Planning Commission may grant exceptions.
- Delayed enforcement: Owners of ADUs built before Ord. No. 782 may request up to a five-year delay in enforcing building standards; applications accepted until January 1, 2030.
Official Millbrae ADU Resources
Let's plan your Millbrae ADU
Tell us about your lot and goals. We will show you what you can build in Millbrae, what it costs and how long it takes.
Book a free consultationCall (650) 770-3586More from iBuilders
Everything ADU, the complete Bay Area ADU guide · Garage to ADU conversions · Room additions · Full house remodeling
ADU Rules in Other Bay Area Cities
Rules, fees and processes change. This page summarizes Millbrae's published ADU rules for planning purposes; confirm details with the city before you build. Not legal advice. iBuilders Design and Build · CSLB #1077269 · 710 Lakeway Dr, Suite 200, Sunnyvale, CA 94085.